DEEP: Hopeville Pond Boat Launch

Hopeville Pond Boat Launch
Griswold

A 3 foot drawdown will commence on or about October 30, 2017; During this time, the boat launch area may be shallow. The lake is scheduled to be refilled by April 2, 2018. However, there is always a risk that refilling may not be achieved by the target date due to unusually dry weather conditions.
{A view from the Hopeville Pond boat launch.}

Site Sketch of the Hopeville Pond Boat Launch (PDF)

Type: Trailered
Season: Open from the Friday before the third Saturday in April through November, 8 am to sunset.
Address: 844 Hopeville Road, Griswold
Directions: I-395, Exit 86, south on Route 201, right into Hopeville Pond State Park.
Lake Area: 137 Acres
Regulations: 8 MPH limit, no water-skiing.
Docks: None
Toilets: Flush (Seasonal)
Parking Spaces: 20
Parking Surface: Paved
Access Road Surface: Paved
Ramp Surface: Paved
ADA Accessible: No
Additional Info:
Schedule of Marine Events and Fishing Tournaments (Note: tournaments are not open to the general public)

Boat Launches in Connecticut

Content Last Updated on October 26, 2017.